espa2
espa
English

TURN-ΚEY PROJECTS

In Healthcare industry, we are the only medical equipment company having the complete human resources and the logistical infrastructure to carry out turn-key projects and deliver a turn-key clinic, hospital or doctor’s practice.

Our human resources are staffed with distinguished executives with high scientific training and long experience in planning and implementing turn-key projects for:

  • Diagnostic centers
  • First level group medical practices
  • Daily Care Units
  • Rehabilitation Centers
  • Hospital Units

 

In our recent history, we have successfully undertaken and carried out major equipment supply programs at the EUROPEAN INTERBALKAN MEDICAL CENTER of Thessaloniki and the PAPAGEORGIOU GENERAL HOSPITAL of Thessaloniki during their construction, the ATHENS MEDICAL GROUP, the IASO GROUP, the HYGEIA HOSPITAL, the METROPOLITAN HOSPITAL, the REA MATERNITY HOSPITAL, the FILOKTITIS MEDICAL REHABILITATION CENTER etc.

Apart from Athens and Thessaloniki, we have carried out major equipment supply projects at the ANIMUS KYANOYS STAVROS Clinic in Larissa, the IASIS Clinic – GAVRILAKI General Clinic, the Chania Therapeutic Center, the Aigio General Hospital, the Thira General Hospital etc.

See below some of our major projects.

MAJOR PROJECTS

VARIAN RADIATION PROTECTION STUDY – RADIOTHERAPY EQUIPMENT INSTALLATION

In exclusive collaboration with the leading Linear Accelerator Manufacturer VARIAN MEDICAL SYSTEMS, we provide complete radiotherapy-brachytherapy solutions including, amongst others: installation of the supplied equipment, training of hospital personnel in the use of equipment, radiation protection and general configuration of the installation site (and in several occasions, even constructing the radiation proof building that will accommodate the supplied radiotherapy equipment).

MAJOR PROJECTS

THIRA GENERAL HOSPITAL 2010

Our company undertook the supply and installation of medical and hosting equipment at the newly-built General Hospital of Thira with a total capacity of 44 beds.

MAJOR PROJECTS

FILOKTITIS – RECOVERY & REHABILITATION CENTER

Within just 5 months, the supply and installation of the medical and hosting equipment for the FILOKTITIS Recovery and Rehabilitation Center was successfully completed. Training of the medical and nursing staff in the operation of the installed equipment was also carried out. The FILOKTITIS multi-purpose center operates in accordance with international standards and ensures the physical, mental and social rehabilitation and reintegration of underaged and adult patients. It has 125 beds for both in-hospital and day-care patients, as well as full facilities for monitoring, treatment and training of visiting patients.

MAJOR PROJECTS

KABUL MOBILE MILITARY HOSPITAL

The Turn-Key Projects Department of our company successfully carried out the project of the complete medical and hosting equipment of the mobile hospital unit sent by the Greek Army to the capital of Afghanistan. Within shorter time than the conventional, our company handed over all the equipment and our technicians travelled to Kabul to set the machinery in full operation and get the medical and nursing staff trained for their use on the spot. The Mobile Military Hospital of the Greek Army in Kabul included two complete surgeries, an intensive care unit, an emergency department, a resuscitation unit, as well as an X-ray and a microbiological laboratory.